UCHealth Poudre Valley Hospital Building A

About the Project

Located on the Poudre Valley Campus, this 150,000 SF, three-story addition/renovation was shoe-horned in the northeast corner of the campus and tied into the existing hospital at a number of locations. The project includes a 54-exam room Level II Emergency Department, 25-bed orthopedic unit, 25-bed surgical ICU (shelled), two MRIs (one relocated), Central Lab, relocation/upgrade of the primary power to hospital, chilled water plant and cooling tower equipment replacement, new utility tunnels, 100% replacement of the pneumatic tube system throughout the existing hospital, new roof-top helipad and demolition of the existing Building A wing and adjacent utility tunnels.

 

Because the existing hospital underwent a series of additions over its lifespan, the aggregated structure has multiple levels with differing floor elevations and differing floor-to-floor heights resulting in a challenging design to connect the existing building to the new addition. The project team used integrated project delivery principles to coordinate the new design and VDC as well as laser scanning to coordinate the existing conditions with the new design.

Quick Facts

  • Location Fort Collins, CO
  • Client UCHealth
  • Architect Freeman White
  • Industry Healthcare
  • Line of Business Construction
  • Delivery Method CM at Risk
  • Completion Date December 2016
  • Duration 19 months
  • Contract Value $ 59,500,000
  • Square Footage 150,000 SF

Related Projects

Contact Us

X

Oh no... this website is not a fan of Internet Explorer!

Due to some geeky technical reasons, the Hensel Phelps website is best viewed on any browser other than Internet Explorer. However, if you are a diehard IE fan you can continue to use it, but may have a less than great experience and will receive this annoying reminder every day. We recommend one of the following browsers to take full advantage of the Hensel Phelps website. Thank you!

Chrome   Firefox   Edge