About the Project
The Engineering Unit 3 project at UC Irvine was constructed to provide primarily wet and dry labs and expansion space for the five engineering departments: Electrical Engineering and Computer Sciences, Biomedical Engineering, Chemical Engineering and Materials Science, Mechanical and Aerospace Engineering and Civil and Environmental Engineering. The project added much-needed surge space and a 350-seat lecture hall. The multi-story facility was constructed while the campus was in session with ongoing operations while other construction projects were being built simultaneously. Careful attention was placed on the safety of students, faculty, and staff while construction was in progress.
Awards
2009
- ACI Award – In Recognition of Outstanding Achievement and Excellence in Concrete Construction
- Educational Facilities Design-Build Excellence Award
Related Projects
-
-
-
-
-
-
Education project
The University of Texas at Austin Dell Medical School Ambulatory Surgery Center Learn More