The Surgery, Radiology, and Laboratory Medicine (SRLM) Building is Hensel Phelps’ sixth project with the National Institutes of Health (NIH). The project is located on the NIH campus in Bethesda, Maryland. The design-build project includes preconstruction services and the construction of a new building. The new 630,000 SF building will connect to the existing NIH Clinical Research Center (CRC).
The project includes 550,000 SF of new construction and 80,000 SF of renovations. The new building will have 11 stories, with 9 above ground and 2 below ground. The levels below ground will include program space and important building systems. The new building will also connect directly to the CRC’s west wing, which will be renovated.
The project also includes relocating part of a utility tunnel, rebuilding a children’s playground, and connecting the SRLM Building to a new pedestrian tunnel. This tunnel will link to a future Patient Parking Garage.
Challenge
During the enabling phase of the NIH SRLM project, it was required to re-route emergency egress and emergency power duct bank for the existing hospital during site excavation, support of excavation (SOE) and lower foundations. This was required due to three emergency egress pathways exiting directly to the SOE location and an emergency duct bank spanning directly over the excavation site. The excavation created a 30-foot drop for an extended time. Due to the length of time and the hospital’s life safety requirements, re-routing egress inside the existing building was not an acceptable solution. In addition, the power duct bank could not be re-routed and needed to be supported.
Solution
Hensel Phelps, with the help of Goettle, innovated a solution to build a temporary pedestrian bridge over the top of the duct bank, which provided structural support and maintained emergency egress. Piles had to be precisely drilled directly adjacent to support the duct bank and not interfere with newly installed and existing campus utilities. Additionally, the piles had to be accounted for with a new basement constructed beneath the duct bank. The piles supported sizeable steel I-beams so cables could be hung to hold up the existing duct bank. Once the duct bank was supported and the upper steel installed, the site team built a scaffold bridge over the top to allow pedestrian egress to be re-routed. Once the Fire Marshall approved and confirmed that fire, life, safety and egress requirements were met, excavation continued. The temporary pedestrian bridge structure was removed after backfilling of the basement structure in late 2024.
Results
The pedestrian bridge provided a safe means of emergency egress for CRC building occupants during the site excavation, SOE and lower foundations. It also provided structural support for the emergency power duct bank feeding the building. As an added benefit, the bridge also provided overhead protection for a tower crane adjacent to the area.
Related Projects
-
Healthcare project
NIH Rocky Mountain Laboratory Comparative Medicine Center – Building B Learn More -
-
-
Healthcare project
INOVA Center for Personalized Health Central Facilities Building Renovation & Air Handling Unit Replacement Learn More -
-